The following video shows an installation video of a 1400mm Wastop with bespoke flange being fitted.

The unique headwall design on this site, with curved wing walls and base, meant a bespoke approach was required. The team conducted a laser survey on the site and created a 3d drawing using CAD. With this drawing, our partners at Wapro AB (Inc) were able to model and design a bespoke WaStop to ensure minimal civil works were required.

As you can see from the video access to the site also proved rather challenging with a boat and man basket both required. Even with these challenges, the WaStop was installed in less than 2 hours.